Projects

Dam Gravity Fed Costing Study

  • Location | Burdekin River, North QLD
  • Specs | Part of a $1.2 billion project

INVOLVED EXPERTS

Burdekin Dam to Ross River

Premise has prepared costings for a gravity-fed water supply from the Burdekin Dam to the Ross River Dam. Our team has compiled costing reports including engineering sketches, engineering fees, and subsequent reports.

Premise is also providing additional engineering support to Local Government’s Joint Water Taskforce, such as:

  • A review encompassing all relevant engineering documentation associated with bulk water supply options for the Townsville Urban Water Supply
  • A high-level summary of engineering analysis, options analysis, risks identifications, and preliminary costings
  • Assistance with scoping of additional engineering assessments
  • Facilitation of further detailed reviews